Infrastructure

Terwillegar Footbridge

Industry leader in commercial and residential projects.

Terwillegar Footbridge

The RMC Group of Companies Ltd. took on the technical challenge of pouring concrete for the Terwillegar Footbridge on the north side of the river, the 262-meter-long footbridge links Terwillegar Park to Oleskiw River Valley Park. This unique, minimalist profile of the first ‘stressed ribbon’ bridge in Edmonton provides a striking river valley crossing.

$24.5 Million Dollar Project
Stressed Ribbon Bridge
262M in Length
Canada's Longest Stressed Bridge
Excellent Quality Record
ACI Award of Excellence
The maximum horizontal force required to support the tension in the stressed-ribbon structure is as much as 55,000 kN (equivalent to the weight of 16 Boeing 747 aircrafts)
start your project

Infrastructure Projects

Similar Projects

Infrastructure

Anthony Henday

Infrastructure

23rd Ave. Interchange

Infrastructure

North-Link LRT Tunnel

Infrastructure

Site C

Come Build a Better Future With Us

Apply Now